Check Box for These Contents In the event of missing or defective parts please call our customer service dept. at 1 800 282 9346, ext #20 (Mon. to Fri
STEP O NE2Layout the horizontal bottom rail and insert the two long verticalspindles followed by seven of the middle rails. The spacing should be rou
ST EP T W O3Place the two side panels with 50 inches between the posts.Place and fasten a beam to the outside of the posts as shownbelow. The beam sh
ST EP TH RE E4Fasten the seven filters with the screws provided, aligning them to the pre-drilled holes on top of the beams as shown.Apply a small am
5ST EP F IV E1Arbor InstallationMove the arbor to its final location (you will need a helper). When you are satisfied with the location, mark the pos
Comentários a estes Manuais